Installation
RCI Adventure Products (RCI) offers two installation options for clients to ensure both parties are in compliance with the following: ASTM F24 Body of Standards, American Steel Construction Manual, American Welding Society D11 Weld Codes, American Society of Civil Engineers 7 Minimum Design Loads, and the International Building Codes for General Construction.
The first option provides clients with an RCI installation team that can fully execute all points of installation and equipment procurement on-site. As a second option, RCI provides an installation team leader to guide the client’s crew through the installation process from start to finish. This process utilizes equipment that the client schedules and provides. In either case, all structures undergo a commissioning inspection and audit that is performed by a member of the RCI engineering team as part of the purchase package.
Contact Us Today